Project Start: Summer 2023
Location: N 17th St from New York Ave to Maryland Ave; Maryland Ave from N 17th St to the alley between N 16th Ave and Belknap St (map below).
Timeline: Construction related to the force main installation will begin the week of July 10th.
Road Closures: Periodic closures of N 17th St while directional drilling is taking place.
Check out the informational brochure HERE!
Lift Station 3 (located south of Belknap and New York Ave) and its associated force main were both built in 1939. The 2850 ft force main was constructed of cast iron and is at the end of its service life. This force main endured a rupture in 2007, and due to its age and material is ready for replacement. In addition to the force main, the lift station will also be replaced. The new lift station will be constructed within the CSTP 6 facility at the end of Texas Road and will include new high efficiency pumps.
The new force main will be installed with directional drilling. This will require the excavation of boring pits to locate the drilling equipment in addition to periodic closures during drilling efforts.
Wes Vann
City of Superior ESD
Wastewater Process Engineer
Office: (715) 394-0392 EXT. 1014
Mark Unger
City of Superior ESD
Wastewater Facility Planning Coordinator
Office: (715) 394-0392 EXT. 1006
Lance Lindahl
Northland Constructors
Project Manager
(218) 625-2286
Jeremiah Wendt
SEH
Project Manager
(715) 246-9906